michael spencer Posted December 7, 2009 Posted December 7, 2009 Im Back.If I make changes to a sequence and Save Changes, and the sequence is already installed in the schedule editor, will the changes automatically be changed in the schedule? Hope this makes sence.
shfr26 Posted December 7, 2009 Posted December 7, 2009 I may be wrong, but I do not think the changes will take effect unless you take it and make the changes, and put it back in. This was discussed a while ago , I'll look for it
shfr26 Posted December 7, 2009 Posted December 7, 2009 The [highlight= #88ff88]show player does not check sequences for changes. Once a [highlight= #88ffff]sequence has been loaded, that's the version of that [highlight= #88ffff]sequence that will be used forever thereafter, until the next run of the [highlight= #88ff88]show.I think I found it. This is from DanGuess I did something wrong, but you get the idea
jimswinder Posted December 7, 2009 Posted December 7, 2009 I have found that when I make a change, and I want the change to take effect in the next show, I need to "Disable Shows" then right away "Enable Shows" IF you do not change the Sequence Name and save it as something different.Obviously then, you would have to load the new sequence name into the Show Scheduler.
Recommended Posts