Guest guest Posted May 27, 2007 Share Posted May 27, 2007 http://www.grimlabs.com/LOR/Here's some pics of my layout (after two years). I planned to gang AC relays to each channel so that I could control DC halloween props during that season and also keep the normal functionality for christmas.The relays are ganged in fours and I have four switches that can disable them (for when I need AC channels that fade, relays dont sound so good under a long fade). So I can disable all the relays four at a time.Since the relays are double pole double throw my options are endless as to what I can switch with this setup. I can switch motor loads or 24v DC solenoids. I used screw termianls to allow easy attachment of my DC needs.Check it out Link to comment Share on other sites More sharing options...
Guest guest Posted May 28, 2007 Share Posted May 28, 2007 Wow, that's a lot of crimping Link to comment Share on other sites More sharing options...
Guest guest Posted May 28, 2007 Share Posted May 28, 2007 You aint kiddin!!!I plan to run a cemetery scene with animations will sync to the soundtrack.Hope I get my new props done ....gotta get buildin!! Link to comment Share on other sites More sharing options...
Recommended Posts