DanglinModifiers 0 Posted April 3, 2012 Share Posted April 3, 2012 Hate to push it, since I know "it's coming" but it would be great to have an update.Rumors are swirling that it's been delayed, may not be happening at all, or may be a hardware solution.I upgraded to S3 based on the promise that E1.31 support was coming in the first half of the year. We're getting close. Based on how slow sequencing pixels is going to be, I need to get started pretty soon.Problem is, I don't even know how to create the channels in LOR so they're compatible with E1.31 when/if it is released. I don't want to configure 600 channels twice for obvious reasons.As such, I'd really appreciate an update as to whether I should keep waiting for E1.31 support directly from LOR S3, or whether I need to look at some of the other options.And I'd be really, really appreciative if someone could tell us how to set up E1.31 channels now, and get a head start on sequencing. Link to post Share on other sites
J_Plak 0 Posted April 3, 2012 Share Posted April 3, 2012 Well Said Steve, I have set a cut off date June 30! Link to post Share on other sites
Guest wbottomley Posted April 3, 2012 Share Posted April 3, 2012 Good luck with that. lolI would place a bet that nothing gets mentioned except the generic canned response. Link to post Share on other sites
Donny M. Carter 5 Posted April 3, 2012 Share Posted April 3, 2012 wbottomley wrote:Good luck with that. lolI would place a bet that nothing gets mentioned except the generic canned response.Give Dan a chance William! Gosh!! You never know, he may surprise us!! Right Dan? Link to post Share on other sites
Guest wbottomley Posted April 3, 2012 Share Posted April 3, 2012 Donny M. Carter wrote:wbottomley wrote:Good luck with that. lolI would place a bet that nothing gets mentioned except the generic canned response.Give Dan a chance William! Gosh!! You never know, he may surprise us!! Right Dan? LOLIt's a set up that he could knock it out of the ball park. Link to post Share on other sites
SteveMaris 37 Posted April 3, 2012 Share Posted April 3, 2012 Is it something that is really difficult to add? It seems other programs added it in shortly after it was called for.An update would be great. As mentioned, I have halted my sequencing until I am 100% sure as to what my show will actually be. Link to post Share on other sites
Tim Fischer 196 Posted April 3, 2012 Share Posted April 3, 2012 I'm anxious to hear more information on this as well, so I can plan my display and start sequencing for this season. I'm really hoping this doesn't slip to late in the calendar year (or worse) or I'll have to look at other options myself, and I really don't want to. Link to post Share on other sites
Timon 2 Posted April 4, 2012 Share Posted April 4, 2012 I think the safe bet I to plan on using xlights to run the show then it doesn't matter when E1.31 shows up. Link to post Share on other sites
LightORamaDan 0 Posted April 4, 2012 Share Posted April 4, 2012 E1.31 has been implemented and is working in a branch of the S3 software. We will release it for beta testing in about 4 weeks. The reason for the timing is that we are scheduling the release of the E1.31 software to coincide with the release of E1.31 hardware (4 port DMX gateway and Cosmic Color Matrix (CCM) a multi-port pixel controller). In the event there are delays with the hardware we will release S3 software with E1.31 support this summer.We are not releasing any details on the new hardware at this time but I will reiterate that if we have any delays with hardware schedules we will uncouple the release of an integrated solution and release just the software support for E1.31As far as sequencing today, you can setup your channels as DMX universe(s). If you are doing so for RGB channels this will require two steps. First create a DMX universe then convert it to RGB channels.Best regards,DanLight O Rama, Inc. Link to post Share on other sites
DanglinModifiers 0 Posted April 4, 2012 Author Share Posted April 4, 2012 Great news! Thanks, Dan. Link to post Share on other sites
Tim Fischer 196 Posted April 4, 2012 Share Posted April 4, 2012 Excellent news! Thanks for the peek behind the curtain, Dan. Link to post Share on other sites
J_Plak 0 Posted April 4, 2012 Share Posted April 4, 2012 Tim Fischer wrote: Excellent news! Thanks for the peek behind the curtain, Dan.Dan Thanks for the updated :cool: Link to post Share on other sites
SteveMaris 37 Posted April 4, 2012 Share Posted April 4, 2012 Sequencing begins!Thank you for the update! Link to post Share on other sites
ben 0 Posted April 6, 2012 Share Posted April 6, 2012 awsome news Dan look forward to hearing how it all goes Link to post Share on other sites
Timon 2 Posted April 9, 2012 Share Posted April 9, 2012 LightORamaDan wrote:E1.31 has been implemented and is working in a branch of the S3 software. We will release it for beta testing in about 4 weeks. The reason for the timing is that we are scheduling the release of the E1.31 software to coincide with the release of E1.31 hardware (4 port DMX gateway and Cosmic Color Matrix (CCM) a multi-port pixel controller). In the event there are delays with the hardware we will release S3 software with E1.31 support this summer.I think one very interesting will be what pinout LOR uses on their E1.31 hardware? Will it be XLR out like the iDMX1000, industry standard RJ45 pins 1and 2 or LOR standard RJ45 pins 4 and 5?I'm leaning toward XLRs but I would not be supprise to see LOR pinouts. I don't think there is a chance that they'll use the industry standard RJ45 pinout.Bets anyone:D Link to post Share on other sites
LightORamaDan 0 Posted April 9, 2012 Share Posted April 9, 2012 Timon wrote:LightORamaDan wrote:E1.31 has been implemented and is working in a branch of the S3 software. We will release it for beta testing in about 4 weeks. The reason for the timing is that we are scheduling the release of the E1.31 software to coincide with the release of E1.31 hardware (4 port DMX gateway and Cosmic Color Matrix (CCM) a multi-port pixel controller). In the event there are delays with the hardware we will release S3 software with E1.31 support this summer.I think one very interesting will be what pinout LOR uses on their E1.31 hardware? Will it be XLR out like the iDMX1000, industry standard RJ45 pins 1and 2 or LOR standard RJ45 pins 4 and 5?I'm leaning toward XLRs but I would not be supprise to see LOR pinouts. I don't think there is a chance that they'll use the industry standard RJ45 pinout.Bets anyone:DOn the hobby version, which will be the first version released it will have RJ45 connectors, constant with the DMX standards.Dan Link to post Share on other sites
Timon 2 Posted April 9, 2012 Share Posted April 9, 2012 LightORamaDan wrote:Timon wrote:LightORamaDan wrote:E1.31 has been implemented and is working in a branch of the S3 software. We will release it for beta testing in about 4 weeks. The reason for the timing is that we are scheduling the release of the E1.31 software to coincide with the release of E1.31 hardware (4 port DMX gateway and Cosmic Color Matrix (CCM) a multi-port pixel controller). In the event there are delays with the hardware we will release S3 software with E1.31 support this summer.I think one very interesting will be what pinout LOR uses on their E1.31 hardware? Will it be XLR out like the iDMX1000, industry standard RJ45 pins 1and 2 or LOR standard RJ45 pins 4 and 5?I'm leaning toward XLRs but I would not be supprise to see LOR pinouts. I don't think there is a chance that they'll use the industry standard RJ45 pinout.Bets anyone:DOn the hobby version, which will be the first version released it will have RJ45 connectors, constant with the DMX standards.DanI totally surprised but in the most plesent way:) Will the outputs be electrically isolated? That would be icing on the cake.Your statement would lead one to assume there will be a "Pro" version. Link to post Share on other sites
Beefer 0 Posted April 25, 2012 Share Posted April 25, 2012 quivering with anticipation!!!!! Link to post Share on other sites
Papa-LF 2 Posted April 29, 2012 Share Posted April 29, 2012 LightORamaDan wrote:Timon wrote:LightORamaDan wrote:E1.31 has been implemented and is working in a branch of the S3 software. We will release it for beta testing in about 4 weeks. The reason for the timing is that we are scheduling the release of the E1.31 software to coincide with the release of E1.31 hardware (4 port DMX gateway and Cosmic Color Matrix (CCM) a multi-port pixel controller). In the event there are delays with the hardware we will release S3 software with E1.31 support this summer.I think one very interesting will be what pinout LOR uses on their E1.31 hardware? Will it be XLR out like the iDMX1000, industry standard RJ45 pins 1and 2 or LOR standard RJ45 pins 4 and 5?I'm leaning toward XLRs but I would not be supprise to see LOR pinouts. I don't think there is a chance that they'll use the industry standard RJ45 pinout.Bets anyone:DOn the hobby version, which will be the first version released it will have RJ45 connectors, constant with the DMX standards.DanSo Dan,I am assuming that the licensing of the function of e1.31 will incorporate with SuperStar? If so will the licensing cost of SuperStar change? How many universes will your software support? And do you have a time table for how long you will leave the new S3 release to remain in beta? Link to post Share on other sites
shfr26 144 Posted April 30, 2012 Share Posted April 30, 2012 Just curious, Did the beta testers get this yet???? Any news on how its going??? Or is Beta testing kept private and no one can tell us until it is done being tested? Dan did say about a month, about a month ago. How long does the testing usually take? The first half of the year is closing fast. Link to post Share on other sites
shfr26 144 Posted May 1, 2012 Share Posted May 1, 2012 Since this is May 1st, that gives two months for Beta testing and release since it was stated "Will be released in the first half of the year". Link to post Share on other sites
Don 302 Posted May 1, 2012 Share Posted May 1, 2012 shfr26 wrote: Since this is May 1st, that gives two months for Beta testing and release since it was stated "Will be released in the first half of the year".Just playing devils advocate here, but we were also told that CCB's and CCF's would be released in 2011.I don't have any inside information regarding the status of E1.31, but things happen that we (the users) and they (LOR) have no control over.Just something to keep in mind. Link to post Share on other sites
Timon 2 Posted May 1, 2012 Share Posted May 1, 2012 Don wrote:shfr26 wrote: Since this is May 1st, that gives two months for Beta testing and release since it was stated "Will be released in the first half of the year".Just playing devils advocate here, but we were also told that CCB's and CCF's would be released in 2011.I don't have any inside information regarding the status of E1.31, but things happen that we (the users) and they (LOR) have no control over.Just something to keep in mind.But didn't they sell CCB's and CCF's during the sale?:shock: At least I thought I saw them. I guess that must have been either a "Pre-order" or I was dreaming;) Link to post Share on other sites
Don 302 Posted May 1, 2012 Share Posted May 1, 2012 Timon wrote: But didn't they sell CCB's and CCF's during the sale?:shock: At least I thought I saw them. I guess that must have been either a "Pre-order" or I was dreaming;)In 2011? No, they did not sell the items/pre-order, etc. Link to post Share on other sites
Guest guest Posted May 1, 2012 Share Posted May 1, 2012 Don wrote: shfr26 wrote: Since this is May 1st, that gives two months for Beta testing and release since it was stated "Will be released in the first half of the year".Just playing devils advocate here, but we were also told that CCB's and CCF's would be released in 2011.I don't have any inside information regarding the status of E1.31, but things happen that we (the users) and they (LOR) have no control over.Just something to keep in mind.Thats a valid (though frustrating) concern if it involves hardware manufacturing, but as dan mentioned above, the software is working to some level, so would expect anything preventing that from being released to beta as stated would be internal.I'm more a bystander in this one, as with past track record of support and releases, not depending on LOR for E131 support within the needed timeline. Sandevices coupled with LSP serves the purpose presently. Just a shame to see a lot of LOR controller spend this season on the shelf as they currently can't support what I'm wanting to do. Like others, especially after last season, not going to gamble this year... Link to post Share on other sites
Recommended Posts