Jump to content
Light-O-Rama Forums

Ready for Testing!


Mark Showalter

Recommended Posts

Thanks Glenn "GS" for posting a larger version of this formation last September. As you can see I used your controller stand design. They work great... none of the controllers have gotten out of line since I finished. :D

Attached files 252225=13717-July Tenth Formation.jpg

Link to comment
Share on other sites

Thanks! I've brought each of these to the office computer to sync and test. They are all ready for duty. This time of year I seem to be spending more time working on display items rather than sequencing. Jeff... I'll go get you a tissue.:P

Link to comment
Share on other sites

BrownOut wrote:

Where is the beer cooler and TV in the shop?? Looks great.

Never mind the cooler and the TV - I'd prefer to have whatever is in those boxes...
Link to comment
Share on other sites

I prefer the best of both worlds. The wires to the upper right of the tool box go to the TV (which is rarely on) and the fridge is just around the corner to the left of where the photo was taken. I try and live by the correct shop visitor standards of "always have a cold beer ready for me because you know I will have one for you."

Link to comment
Share on other sites

Dan Ancona wrote:

Shop's too clean .....  compared to mine!  :) Nice work on the controller setup.

Are you kidding? Note the CDI boxes in the right foreground still waiting to be unpacked and all those lights attached to something festive. All in time...
Link to comment
Share on other sites

  • The topic was locked
Guest
This topic is now closed to further replies.
×
×
  • Create New...