Jim Saul Posted November 6, 2011 Share Posted November 6, 2011 Outside is 96% done Sequencing is is about 10% Link to comment Share on other sites More sharing options...
Guest guest Posted November 6, 2011 Share Posted November 6, 2011 I use a DC-MP3 Showtime Director, but I have gotten the outside of my apartment completely done. Finished up Sunday (between the rains) around 5:30pm or so. Ran my first test to check everything with a few sequences and found I hadn't copied everything from the original sequence into the new configuration. *DOH!*So when lights weren't working I almost went into a panic thinking, oh crap, I've had a controller go bad. Not, just wasn't anything in there to tell that controller to turn on!Got a lot of free open channels, and I have a lot of Net lights (LED) that I'm going to talk to my neighbor again next door to see if they'll let me put them on their bushes and connect them to a few open channels I have. At least that way, each side of the building will look a lot better with lights on each side. No room for any decor on their side as the bushes are large. Just have to get some Duct tape to cover the cords (not more than 2 or 3 channels) and placed near and across the stairs.I think now that I've got everything up and they aren't going to put anything out front, I'll get the go ahead to add the lights to those bushes over there.So if so, just a little more work, but not much, just have to update my sequences again, that's all, but that's not always too difficult to do! Here's a sample pic of my completed outside display. (Now I have to start and get busy on the inside that will be controlled by controller #1!) Attached files Link to comment Share on other sites More sharing options...
Tom Clapper Posted November 7, 2011 Author Share Posted November 7, 2011 miaskiewicz christian wrote: Don't have time to answer your question, my display is waiting ! lolBut yesterday with the cool whether I was able to set many things.miaskiewicz christian wrote: Don't have time to answer your question, my display is waiting ! lolBut yesterday with the cool whether I was able to set many things.Don't have time to answer but you have time to double post?? Sounds fishy to me!!:shock: Link to comment Share on other sites More sharing options...
Tom Clapper Posted November 7, 2011 Author Share Posted November 7, 2011 Dan C. I will get ahold of you sometime...I do want to check out your show and any others in Omaha that you know about. Good luck everyone!! Link to comment Share on other sites More sharing options...
jldavis1969 Posted November 9, 2011 Share Posted November 9, 2011 There are now 15 days til Lights on for US. How many of you are almost or are ready right now? Link to comment Share on other sites More sharing options...
miaskiewicz christian Posted November 9, 2011 Share Posted November 9, 2011 Tom Clapper wrote: miaskiewicz christian wrote: Don't have time to answer your question, my display is waiting ! lolBut yesterday with the cool whether I was able to set many things.miaskiewicz christian wrote: Don't have time to answer your question, my display is waiting ! lolBut yesterday with the cool whether I was able to set many things.Don't have time to answer but you have time to double post?? Sounds fishy to me!!:shock:The double post is a bug because I posted this only once. :? Link to comment Share on other sites More sharing options...
CKSedg Posted November 9, 2011 Share Posted November 9, 2011 jldavis1969 wrote: There are now 15 days til Lights on for US. How many of you are almost or are ready right now?Ahhhhhh! Only 15 days? I need at least 16. No, really---I'll be ready on Thanksgiving Day. Link to comment Share on other sites More sharing options...
Mwhite7097 Posted November 9, 2011 Share Posted November 9, 2011 Made a big mistake by planning a Thanksgiving vacation away from home, which means I have to be done by this weekend. Told the wife to load up the frige with Red Bulls because Fri and Sat are going to be all nighters. I would have started earlier, but the Nor'easter we had knocked out our power for 10 days, destroyed most of my trees, and basically left a HUGE mess which all had to be cleared before I could put a single thing out. So much for advanced planning. Link to comment Share on other sites More sharing options...
dknahoolewa Posted November 9, 2011 Share Posted November 9, 2011 good thing i have next week off. I only have the outline of the roof and the guy wires on my mega tree done. So like 500 lights out of 7000 or so. I think i've got some work to do. at least the my show is programed. Link to comment Share on other sites More sharing options...
CKSedg Posted November 9, 2011 Share Posted November 9, 2011 dknahoolewa wrote: good thing i have next week off. I only have the outline of the roof and the guy wires on my mega tree done. So like 500 lights out of 7000 or so. I think i've got some work to do. at least the my show is programed.Same here. I have scheduled off work this Thursday and Friday and the following Thursday and Friday. I think with those four days and Saturdays I will be ready. Link to comment Share on other sites More sharing options...
Al Dube Posted November 9, 2011 Share Posted November 9, 2011 Way too many thing left to do to list.... Its only 10 O'clock, I can get by on 3 hours of Sleep ...............Back to the Garage !!!!! Link to comment Share on other sites More sharing options...
jldavis1969 Posted November 9, 2011 Share Posted November 9, 2011 CKSedg wrote: jldavis1969 wrote: There are now 15 days til Lights on for US. How many of you are almost or are ready right now?Ahhhhhh! Only 15 days? I need at least 16. No, really---I'll be ready on Thanksgiving Day.Day Zero is thanksgiving day!!!! Link to comment Share on other sites More sharing options...
Frybread Posted November 10, 2011 Share Posted November 10, 2011 Lets see...Waiting on Controller :shock:Waiting on MiniShow Director :shock:Waiting on EDM :shock:Waiting on SPT-1 and connectors :shock:Building 2 Jerry/Spirals this weekendBuilding 2 5 section Archs this weekendBuilding 6 2 color Mini's this weekend.WHAT Me worry???? Link to comment Share on other sites More sharing options...
PaulXmas Posted November 10, 2011 Share Posted November 10, 2011 I have about 75% of the animated elements plugged in.I hope to have all the animated elements completed this weekend.Hard to do anything after work when it gets dark at 4:30... Link to comment Share on other sites More sharing options...
Guest wbottomley Posted November 12, 2011 Share Posted November 12, 2011 I'm getting there. Here's my latest progress: http://www.highcountrylights.com/blog/preparing-for-2011-season.html Link to comment Share on other sites More sharing options...
imawlkr2 Posted November 12, 2011 Share Posted November 12, 2011 Done!!! Finished putting everything up today. Had an emergency with some old blowmold reindeer. They were too brittle and I shattered them when trying to put the antlers in. Spent 3 hours driving around to get three new matching ones.Ran a couple songs tonight and everything looks good. Just need to run each sequence and do some tweaking over the next couple weeks. Link to comment Share on other sites More sharing options...
miaskiewicz christian Posted November 12, 2011 Share Posted November 12, 2011 It's coming soon and I'm 75% ready... this morning extensions for my 8 channel leaping arch... and a few other extensions to make... Link to comment Share on other sites More sharing options...
David Rise Posted November 13, 2011 Share Posted November 13, 2011 Completed setup today except for my "Tune to" sign. I'll wait for that.After a few minor hickups with a GFCI. Got everything working and ran my first complete test. Almost brought a tear to my eyes.1. The WH2 absolutely needs to be placed outside. Ran it from my PC with it inside the house and it was garbage. Even with the antenna outside the window.2. With the transmitter outside, I'll have to make an enclosure for it.3. Looks like I might have a channel plugged into the wrong connection on the board.Got rave reviews from my neighbors and all the folks that drove by. I'm just bursting with pride. My house will have the best display for at least 2 miles.Now I want to sequence more songs....ARGH! What the heck is wrong with me.....LMAO! Link to comment Share on other sites More sharing options...
Arnoldc Posted November 13, 2011 Share Posted November 13, 2011 Major progress has been made over the weekend. I got the fence line and the chasing bushes done.http://vimeo.com/32041118this week I am working on my "mini" trees and going to put them out Saturday, along with my mega tree. Attached files Link to comment Share on other sites More sharing options...
bkdraft Posted November 14, 2011 Share Posted November 14, 2011 Started a couple of weeks ago building my new Mini trees, converted them from tomato cages to Coro Trees, they are up and have been tested. Put the icicle lights on the house couple of weekends ago, last weekend, put up the coro trees, all the controller stands and my new CCR arches. All of this has been tested and runs fine. All I like this weekend is the mega tree. Last several yrs. the mega tree was two colors and 8 channels each color, this year, 4 colors and 12 channels per color. All my songs are sequence, but will go back through them one more more time to tweak on them some. I fire up Thanksgiving night.James112 LOR Channels and 2 CCR's Link to comment Share on other sites More sharing options...