Jump to content
Light-O-Rama Forums

debtoews

Members
  • Content Count

    519
  • Joined

  • Last visited

  • Days Won

    8

Everything posted by debtoews

  1. :-) Im good at spending other people's money...says my hubby! LMAO
  2. Nice Jim! Wonder where the inspiration came from??? lol Merry Christmas XOXO
  3. I have a 24 CCR tree on aluminum square tubing frame for sale. Comes with extra 3CCR's - used 3 years. I live in Central California- PICK up only, unless you just want the CCR's and controller. Make me an offer. NO longer using them. Thanks
  4. I have 2 pixie 8's. Email if interested: debtoews@comcast.net thanks
  5. debtoews

    Pixie 8

    Yes- I think now its the configuration in S5.......Thanks JR for your help!
  6. debtoews

    Pixie 8

    ok well i think I have it configured- unit id assigned etc
  7. debtoews

    Pixie 8

    S5 - recently upgraded
  8. debtoews

    Pixie 8

    I have it plugged into the 485 adapter...so do I have the control panel active and I can play the sequencer editor to view?
  9. debtoews

    Pixie 8

    So why cant I get my S5 sequence to play? is there some special way I have to do it? I want to test this matrix...thanks
  10. debtoews

    Pixie 8

    Yes that was my question....
  11. debtoews

    Pixie 8

    I have a pixie 8 for a small matrix- only running 6 ports LOR protocol....do I have to connect it to a regular LOR controller? I cant seem to get my S5 sequence to play on it- thanks!
  12. debtoews

    New to This.

    Yes LOR protocol not DMX. I run 24 CCR's over 4 networks (6 CCR's per network). They is no way my system along with everything else I run could handle the data. It barely does it over 4 networks. I had to upgrade to S5 only because I was maxed out data load wise in S4. Remember, I run almost 40 houses plus all my other stuff....its insane- ask Jim!
  13. debtoews

    New to This.

    If you are going ribbons (CCR;s I assume) - I would highly suggest you NOT run 16 ribbons on the same network- they will look like crap. Ive had a 24 ribbon tree that I run over 4 networks. Depending on the graphics, running intensity files help too. If you are looking for some cheap CCR's, I have a lot (24-27) with the controllers Im looking to get rid of and also have an aluminum tubing frame. Im in Central Cal. Pm me if your interested- Good Luck!
  14. Ok so Jim do I creat from the LOREDIT file? thanks!
  15. So Im brand new to S5 and have converted all this years show files in S5. The new files are LOREDIT files but to load into show builder they need to be LMS files. SO I noticed the playback feature- is that the file I create and then load into show builder? thanks!
  16. I put in a drop box- thats easier for me. Let me know what you think. Will send email too- thanks!
  17. correction. its not video. its gif files converted to images and a long song
  18. Yes I am the Queen! lol. I believe my license is 40ccrs. This sequence has a lot of video maybe thats why?
  19. SS error comes up stating I need to decrease the number of effects? Failed to allocate memory Cannit build channel commands. Reduce the number of effects in the sequence. ChannelElementsSize: 8256000. Are you kidding me? Then SS just sits and spins. I just upgraded to S5 hoping to resolve issues. Anyone got any suggestions? This sequence is DMX 24x50 tree. thanks
  20. Im changing over to S5 and in S4 I have multiple networks. Aux A-G. This year Im changing out my 24 string CCR tree to DMX pixels so Aux A-D is no longer in use. My question is, can I just leave those blank (A-D) and run E-G? or do I have to start at A? Thanks!
×
×
  • Create New...